No.SCOPE OF WORKLOCATIONCLIENTCONTRACT DATE
1 Design of  Transmission Towers 400 KV Tehran Avangan Co. 1993
2 Mechanical Installation of Benzene Plant   Tabriz Daelim Co. T.P.C 1994
3 Construction of Yazd  Cement  mill Yazd Yazd Cement 1994
4 Construction of Ammonia Reformer Unit Bojnoord K.H.P.C 1994
5 Construction of Ahwaz Walking Beam Furnaces  and Equipment Ahwaz Ahwaz Rolling & Piping Mill 1994
6 Construction of Steam Generation Plant Bojnoord K.H.P.C 1994
7 Fabrication & Installation of Heavy Steel Structure Bojnoord K.H.P.C 1994
8 Construction of Cooling Water System Tabriz T.P.C 1995
9 Electrical & Instrumentation Installation and Commissioning of Coaltar Refinery Isfahan Qatran Co. 1995
10 Construction of Storage Tank farm Tabriz T.P.C 1995
11 Construction of Power Plant Phase I Tabriz T.P.C 1995
12 Restoration of Ramin Power Plant fuel system Ahwaz Ramin Power Plant 1996
13 Renovation and restoration of  Aboozar – Onshore Product Unit Kharg Island N.I.O.O.C 1996
14 Construction of  Alomina Plant Phase II Jajarm Alomina Co. 1997
15 Utility and Offsite and construction of  Walking Beam Furnaces - Yazd Alloy Steel Yazd Danieli "Italy" 1998
16 Construction  of Fire Fighting System of Kharg Island export tank farm Kharg Island N.I.O.O.C 1998
17 Construction and commissioning  of Heavy Diesel Engine Factory Amol I.D.R.O 1998
18 Construction of  Methanol Reformer Unit Kharg Island P.I.D.M Co. 1999
19 Fabrication and installation of  Methanol Jetty Kharg Island P.I.D.M Co. 1999
20 Fabrication and installation of Equipment for Montazer Ghaem Power Plant Karaj MAPNA 1999
21 Construction of  Tire cored Plant Zanjan R.I.I.D 1999
22 Construction of gas compressing Station Ramsar N.I.G.C 2000
23 Construction of Kharg Booster Compressor Plant Kharg Island Kharg Petro. Co. 2000
24 Construction of Dorood  Pipe line Kharg Island N.I.O.O.C 2000
25 Restoration & retuning of Forozan Production Unit  Exchangers. Kharg Island N.I.O.O.C 2000
26 EPC of  Stainless Steel tanks for KHPC Khorasan NARGAN 2000
27 Construction of Cooling Tower System for Shazand Power Plant Arak Mapna 2002
28 Construction of 4 x 250 MW Generators Hydro Power Plant Masjed Soleiman Farab 2003
29 Construction of Gas Oil Storage Tanks Kharg Island N.I.O.O.C 2004
30 Construction of Crystal Melamine Plant Bojnoord K.H.P.C. 2004
31 Construction of  C2 Cracking Plant (9th Olefin) Assaluyeh A.S.P.C 2005
32 South Pars Gas Field 6, 7 & 8- SP678OX-41-020 (RTRP WORK) Assaluyeh TIJD 2005
33 Masjed Soleiman Hydro Power Plant.  (4 x 250 MW ) Turbin Masjed Soleiman FARAB 2005
34 South Pars Gas Field 6,7&8 Utility & Offsite Packages (C5,C6) Assaluyeh TIJD 2007
35 A/G Piping Works Offsite  C2 Cracking 9th Olefin Assaluyeh A.S.P.C 2007
36 Ethylene liquid line from ASPC to JAM 9” Olefin complex Assaluyeh A.S.P.C 2007
37 Ammonia and Urea Complex no. 2  - Urea Plant Assaluyeh PIDEMCO 2008
38 Petrochemical liquid jetty no. 2 Bandar Imam petrochemical special economic zone 2008
39 Design, procurement, prefabrication & erection of 26 tanks of Bandar abbas gas condensate refinery (EPC Project) Bandar Abbas PGSOC 2008
40 South pars gas field development– phase 12 – onshore facilities – EPC1  Kangan  Petro Pars Company  2008